BP35C5 Evaluation Board Set-up: Step Nine

Next, ping router 4 from the border router to verify that communication is possible. If communication is successful, the border router will output "1 transmitted, 1 received, 0.0% loss" as shown on the enlarged image at the bottom of this slide. This concludes the setup for the BP35C5 kit providing testing of the functions and how easily it can be to obtain reliable communication.