Slide 1 Slide 2 Slide 3 Slide 4 Slide 5 Slide 6 Slide 7 Slide 8 Slide 9 Slide 10 Product List
Checking Normal Operation Before and After Test

Before and after each test run, the receiver outputs of both transceivers (RO1 and RO2) were observed for normal transceiver operation during data transmission. Fortunately, no visual differences were observed.

PTM Published on: 2022-05-31