Slide 1 Slide 2 Slide 3 Slide 4 Slide 5 Slide 6 Slide 7 Slide 8 Slide 9 Slide 10 Slide 11 Product List
emi-rfi-slide5

Power cords and data cables are the primary carriers of conducted RFI creating a high risk that other devices on the same power or data network will be impacted. To minimize this risk conducted emissions compliance testing is performed from 150kHz to 30MHz.

PTM Published on: 2012-10-10