Slide 1 Slide 2 Slide 3 Slide 4 Slide 5 Slide 6 Slide 7 Slide 8 Slide 9 Slide 10 Slide 11 Product List
How to Set Up the Evaluation Kit

To set up the evaluation kit, first install the viewer software and connect the mass flow controller to a source of pressurized gas. Then, connect the DB9 cable to the mass flow controller and connect the USB cable to the PC. Finally, choose the right plug, insert it into the power adapter, and connect it to 100 to 240 VAC.

PTM Published on: 2022-03-07