Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11
Slide 12
Product List
The same three simple steps are required for each installation and are as follows: Step 1: The cable jacket is stripped back and the exposed shield is dressed back over the jacket. Then the individual wires are inserted into the Ha-VIS preLink® termination block according to their color codes.
PTM Published on: 2015-07-27